Farmhouse Renovation: Weeks 3 & 4

Well we have officially owned the farmhouse project for 4 weeks now, and I am impressed with how much we have been able to accomplish despite the colder than normal temperatures. Almost everything that is temperature dependent is finished, and once we get the new structure framed and closed in, it wont matter if the weather turns cold again.

For those of you who are interested in the details…

With temperatures in single digits and low teens during week 3, concrete was not able to be poured so we used this time to frame up the footings and line up the appropriate inspections.

IMG_4770.JPG

Things finally warmed up for week 4! We are obviously starting from scratch here, with 16 in wide and 8 in deep concrete footings. Adam does all his own concrete work, but I think even he was ‘over it’ by the time this foundation was poured.

IMG_0026.JPG
IMG_0027.JPG

Next up, we have the 4 ft concrete walls that will serve as the foundation for the structure we will eventually be adding to the home. As you can see from the photos, we are adding quite a bit of square footage to this home! I think even the city is impressed (ha!).

IMG_0036.JPG
IMG_4839.JPG

It’s definitely been nice that Iowa has given us a break with the cold weather so we could finish some of the temperature dependent parts of this project, and hopefully the weather will hold out one more week so we can get the floor poured. Thanks for stopping by the blog today and joining us for this crazy journey!

Cheers!